One of the major advantages of an Apple Cabin prefab house is that much of the construction and interior work can be completed in the factory before shipment.
Instead of transporting individual building materials and completing the entire structure on site, the finished Apple Cabin can be transported as an assembled modular unit.
Once it arrives at the project site, the main work involves unloading, positioning, and connecting the required utilities.

How Is an Apple Cabin Shipped?
Apple Cabins are transported as complete or largely completed units.
After factory production and inspection, the cabin is prepared for transportation according to its dimensions and destination.
For international orders, the typical transportation process is:
Factory → Port → Ocean Shipping → Destination Port → Project Site
The exact transportation solution depends on the cabin size, quantity, destination country, port conditions, and local transportation requirements.
Our standard Apple Cabin models are generally planned around international transportation requirements, but the final logistics solution should always be confirmed before shipment.
Can Apple Cabins Be Shipped in a 40HC Container?
Our commonly supplied Apple Cabin models are transported using 40HC shipping containers, depending on the exact model and shipping plan.
For example, our compact model measuring approximately:
5,800 × 2,250 × 2,450 mm
allows multiple units to be planned for transportation according to the confirmed loading solution.
Our larger model measuring approximately:
11,500 × 2,250 × 2,450 mm
requires a different loading arrangement because of its greater length.
Before ordering, we can recommend a suitable transportation plan based on your selected model and quantity.
What Needs to Be Prepared Before Delivery?
Before the Apple Cabin arrives, the project site should be prepared for installation.
Typical preparation includes:
- Foundation or supporting base
- Electricity connection
- Water supply
- Drainage and sewage
- Suitable access for transportation vehicles
- Space for unloading
- Crane or suitable lifting equipment
Completing these preparations before delivery can make the installation process much more efficient.
How Is an Apple Cabin Unloaded?
Because an Apple Cabin is transported as an assembled modular structure, suitable lifting equipment is generally required at the destination.
A crane or other appropriate equipment can lift the cabin from the transport vehicle and place it onto the prepared foundation.
The lifting method and equipment capacity should be selected according to the cabin’s actual dimensions, weight, site conditions, and local safety requirements.
How Is an Apple Cabin Installed?
Once the cabin has been positioned correctly on the prepared foundation, the remaining installation work is relatively straightforward compared with constructing a conventional building from the ground up.
The general process includes:
- Position the cabin on the prepared foundation.
- Check and secure the cabin according to the project requirements.
- Connect the external electrical supply.
- Connect the water supply.
- Connect drainage and sewage.
- Install any separately shipped accessories.
- Complete the final inspection before use.
Because the internal electrical and plumbing systems can already be installed during factory production, much of the work at the destination involves connecting the cabin to the site’s existing utilities.
Does the Apple Cabin Need On-Site Assembly?
The main Apple Cabin structure does not normally require extensive assembly after arrival because it is transported as an integrated unit.
However, some optional accessories may need to be installed separately.
For example, if the cabin includes an optional outdoor terrace or deck, the deck can be transported with the cabin and assembled at the destination.
Installation guidance, videos, and online technical support can be provided to assist with this process.
How Long Does Installation Take?
Installation time depends on the model, project size, foundation, site conditions, utility preparation, and number of cabins.
A single cabin with a fully prepared foundation and utilities will generally require much less on-site work than a traditional building.
For larger glamping resorts or multi-unit projects, installation should be planned according to the delivery sequence, crane availability, site access, utility network, and overall project schedule.
Can You Help With Shipping?
Yes. For international customers, we can help calculate the transportation solution according to the selected Apple Cabin model, quantity, and destination.
To calculate shipping costs, please provide:
- Destination country
- Destination port
- Delivery address if door-to-door transportation is required
- Required Apple Cabin model
- Quantity
Shipping costs can then be calculated separately according to the current transportation conditions.
Planning Your Apple Cabin Delivery?
Shipping and installation should be considered early when planning an Apple Cabin project.
Selecting the correct cabin model, preparing the foundation and utilities, arranging suitable site access, and confirming the lifting equipment before delivery can help make the installation process much smoother.
If you are planning to import an Apple Cabin, send us your required model, quantity, destination country, and destination port.
We can provide product dimensions, transportation information, loading plans, installation guidance, and a customized shipping quotation.
Contact us today to discuss your Apple Cabin shipping and installation plan.